VIDEO

Integrated Grid Planning Demo

Forecast DER Growth, Identify Constraints, and Evaluate NWAs in One Workflow

EVs, heat pumps, behind-the-meter solar, and large new loads are reshaping demand faster than legacy planning tools can support. Utilities need defensible, asset-level insight to know where constraints are emerging, what is driving them, and when flexible load can defer traditional upgrades.

This demo shows how Bidgely's Integrated Grid Planning solution brings scenario planning, DER load forecasting, grid needs assessment, and non-wires alternatives (NWA) evaluation into one workflow. Powered by AMI-based behind-the-meter intelligence, IGP produces 8,760-hour, 10-year forecasts for grid assets and explains the load drivers behind growth at each transformer, feeder, and substation.

Improve Grid Planning With Premise-Level Insight

Improve Grid Planning With Premise-Level Insight

Incorporate behind-the-meter intelligence into distribution planning and load forecasting.

Plan for DERs With Visibility, Not Assumptions

Plan for DERs With Visibility, Not Assumptions

Understand how solar, storage, and flexible load interact at the premise and feeder level.

Enable Flex Demand Programs That Actually Flex

Enable Flex Demand Programs That Actually Flex

Identify and activate flexible load that can reliably respond during peak and grid events.

Fueling insights for 45+ utilities and over 38 million consumers.

Ready to Start Your Journey With UtilityAI?

Don't let your operational investments stall. Find out how to unlock ROI, reliability, and resilience across your utility.
 

EXPLORE LIVE DEMO